Agility Pakistan Pvt Ltd – The Leader in 3PL in 2018
Our First Project in Pakistan with 8,326 Pallet Positions
Selective Pallet Racks (G+4 Levels), Port Qasim Facility, 120,000 Sqft Area
State of the Area Facility with 16 Docks
Installation took 30 Days
Installed Imported Safety Accessories, Column guards, and frame barriers of 800mm Height giving extra protection to the frames from any interaction with Reach trucks / MHEs